Image: Supplied
GE Vernova has successfully concluded the inaugural maintenance shutdown on its HA gas turbine technology in the regions of the Middle East and South Asia, specifically at two power facilities in Pakistan.
The maintenance was carried out by the company’s engineers at the Haveli Bahadur Shah and Balloki plants, which are managed by the National Power Parks Management Company (NPPMCL).
Inspection for the Bhikki plant is projected to take place in 2026.
“Similar to how vehicles require regular servicing, the average gas turbine needs scheduled inspections to uphold its functionality,” stated Akram Kamal, the CEO of NPPMCL. “The swift execution of this project by GE Vernova has allowed us to maintain reliable electricity delivery, while notably improving the stability of the electrical grid and minimizing the risks of blackouts across the nation.”
Since commencing full operations in 2018, these plants are capable of generating up to 3.6 gigawatts, sufficient to power approximately 7.5 million households, as reported by GE Vernova.
GE Vernova highlights project as a blueprint for other regions
According to Joseph Anis, the president and CEO of GE Vernova’s Gas Power sector for Europe, the Middle East, and Africa, this initiative in Pakistan is expected to set a precedent as similar turbines in the UAE, Bahrain, and Saudi Arabia approach their initial maintenance phases.
The maintenance process in Pakistan involved about 200 personnel over the span of four months, with the company noting that thousands of hours were worked without any incidents.
Having been present in Pakistan since the 1960s, GE Vernova stated its commitment to supporting the country’s aim of achieving 60 percent renewable energy and 30 percent electric vehicle adoption by the year 2030.